Skip to main content
615 Shades, motorized shades and patio screens in Nashville TN 615-431-3789

Commercial & Trade

New construction pre-wire and planning for motorized shades in Middle Tennessee: power and controls planned before the drywall goes up

The easiest time to motorize is before the walls close. We plan outlets, wire runs and controls so the shades are ready when you move in.

Call or text today615-431-3789

Request shade service

Tell us what is going on. We will contact you to confirm the details and set up a time to look at the job.

Or call 615-431-3789

By sending this you agree that we may contact you about your project. See our Privacy Policy.

Prefer to type? Text your request to 615-431-3789

New Construction Pre-Wire & Planning

Pre-wiring for shades means running low-voltage or line-voltage power to each window, and sometimes control wire to keypads, before drywall closes. It avoids exposed wires and patched walls later and gives a cleaner install, especially for wide windows, high windows and whole-house systems. Good planning includes the location of each shade's motor, the type of power, pockets or recesses for headrails and the position of control points.

We plan pre-wire across Middle Tennessee, from custom homes in Nashville and Franklin to larger builds in nearby towns. We review the plans, mark power locations for each window, recommend recessed pockets and headrail details, coordinate with your electrician and walk the house at rough-in.

What you get

Done right, from the first call

01

Plan review

We study the plans and the window schedule.

02

Power and control locations

Each shade's power point and control wiring marked.

03

Recessed pockets and headrails

Details planned so shades look built-in.

04

Rough-in walk-through

We check the wiring before drywall.

The process

How your service comes together

  1. 1

    Review the plans

    We go over windows and wiring.

  2. 2

    Mark and coordinate

    We mark locations with your electrician.

  3. 3

    Check at rough-in

    We walk the house before drywall.

FAQ

Common questions about new construction pre-wire

When should I plan shade wiring?

Before the electrician finishes rough-in, ideally when the window schedule is final.

Is pre-wire necessary for every shade?

No. Battery shades need no wiring, but wired shades are cleaner for large and heavy windows.

Who does the wiring?

Your electrician or builder, working from our plan.

Let us help with your new construction pre-wire

Call, text or send the form. Tell us about the project and we will take it from there.

615-431-3789Text